Strategic Plan
2009-2014


Goal: TO ENHANCE OUR BUILDING AND FACILITY

Objectives:

(1) = High Priority; (2) = Medium priority; (3) = Low priority

  1. Board to contact new City Council – Re: building location stability (1)
  2. Enhance the building exterior
    1. Signage (1)
    2. Parking Lighting Improvements (Since completed by City)
    3. Metal Stairs – East Exits (3)
    4. Re-screw round barrel roof (2)
  3. Enhance the building interior
    1. Update bathrooms (floors, sink, dispensers, wheelchair friendly) (2)
    2. Storage room / Locker room addition (3)
    3. Enlarge Pro Shop sales area (3)
    4. Replace carpet & linoleum (3)
    5. Replace furnace (1)
    6. Redesign bar area to be volunteer friendly (3)
    7. Sound System upgrade (3)
    8. Update Lounge area to make friendly environment for non-curlers, a destination place (2)
    9. Air condition (3)
    10. New linoleum on dance floor (3)
    11. Repaint walls with murals (2)
  4. Upgrades to ice area and compressor room
    1. Replace Ammonia Chiller (1)
    2. Upgrade to energy efficient pumps/switches for compressor room equipment (2)
    3. Concrete floor in ice area (3)
    4. New ice burner (3)
    5. New stones (2)
    6. Re-carpet Home and Away ends (Since completed)
  5. Improve technology utilization
  6. Improve image
  7. Maintain a quality ice area.
  8. Implement efficiency measures where possible.